Thickbroom, Weeford, Staffordshire

The project comprised the installation of a single 3 bladed wind turbine with a maximum hub height of 75m (height to tip to 102m) and maximum rotor diameter of 54m together with associated underground cabling, sub-station and access track to Thickbroom Farm, Weeford, Lichfield, Staffs.

Cadarn Consulting Engineers Ltd were commissioned to design all the foundations and design the access track (vertical and horizontal alignment), prepare full construction issue drawings including general arrangements, rc details, anchor details, vertical and horizontal access track sections, construction details and rc bar bending schedules.